Personnel or tyre fitter(s) in the blast path, arising from:
- Inflation of tyre with personnel in proximity
- Known fault delivered to workshop for maintenance
Credible Failure mode is addressed by:
- BI.00.04 Supervisors apply fit for purpose performance management processes
- BI.01.01 Trained, Competent and Authorised Tyre Maintainers
- BI.01.10 Tyre hazard awareness for maintainers
- BI.03.02 Protocols for all aspects of wheel assembly maintenance and tyre repair
- BI.03.03 Safe inflation protocols including lock ring seating checks
- BI.03.11 Protocol in place for smaller tyre (<24″/600mm) inspection and integrity testing
Last Updated: 23/01/2023 03:18:40pm